Sunday, October 5, 2008

Knowledge Management for Routes Conversion in 11.5.10

1 Responsibility / Navigation / Module
Bills Of Materials

2 Conversion Approach / Reference Documents
BOM_INTERFACE1Document and Bills Of Materials User Guide.

3 Application Setup Requirements
NA

4 Assumptions / Prerequisites / Validations
Prerequisites:
Objects like Items,Resources,Departments need to be converted.
Resources need to be assigned to departments.
SubInventory locator controls need to be assigned to organization and proper flags need to be set.

Validations:
disabled_date
organization_code
inventory_item_number
sub_inventory
alternate_routing_designator
locator_name
departments
resource
resource department assignment

5 Base Tables Effected
BOM_OPERATIONAL_ROUTINGS
MTL_RTG_ITEM_REVISIONS
BOM_OPERATION_SEQUENCES
BOM_OPERATION_RESOURCES
BOM-SUB_OPERATION_RESOURCES

6 Interface Tables / APIs
BOM_OP_ROUTING_INTERFACE
BOM_OP_SEQUENCES_INTERFACE
BOM_OP_RESOURCES_INTERFACE
BOM_SUB_OP_RESOURCES_INTERFACE
MTL_RTG_ITEM_REVISIONS

7 Navigation of Import Program & Parameters
Bills->Import
Parameters:
All Organization =’Yes’
Import Routings =’Yes’
Import Bill Of Material =’No’
Delete Processed Rows =’Yes’

8 Import Errors
MTL_INTERFACE_ERRORS

No comments: